General
National Id
Bulgaria_07
Site name
Dolna Topchia Reserve and its sleevet MalkaTundzha
Summary
The restoration of riparian floodplain habitats in reserve "Dolna Topchia", Bulgaria, was performed by Regional Inspectorate of Environment and Water – Stara Zagora. It was designed and constructed hydraulic structures on river Tundzha (a weir and one channel of 900 m) for recovery of riparian wetland biotypes maintained in the reserve and run off on his sleeve Malka Tundzha.
Light or indepth?
Light
NUTS Code
Югоизточен (Yugoiztochen)
RBD code
BG2000
Transboundary
0
Contact
REC
Sponge Measure(s) implemented in the case study
Longitude
26.56638
Latitude
42.23
Site information
Climate zone
warm temperate moist
Precipitation
650
Mean rainfall unit
mm/year
Temperature
13
Type
Case Study Info
Design & implementations
Application scale
River
Project area
467,600006103516
Inflow volume
32
Inflow volume unit
m3/sec
Design contractual arrangement
Arrangement type | Responsibility | Role | Name | Comments |
---|
Design consultation activity
Activity stage | Key issues | Name | Comments |
---|
Design land use change
Land use change type | Comment |
---|
Design Authority
Authority type | Authority name | Role | Comments |
---|---|---|---|
Lessons, risks, implications...
Key lessons
Insufficient public consultations and limited public information during the NWRM planning and implementation phases create difficulties to deliver integrated (multi-benefit) results.
Success factor(s)
Success factor type | Success factor role | Comments |
---|
Driver
Driver type | Driver role | Comments |
---|
Policy, general governance and design targets
Policy target
Target purpose |
---|
Improved Biodiversity
|
Policy pressure
Pressure directive | Relevant pressure |
---|
Policy area
Policy area type | Policy area focus | Name | Comments |
---|
Policy impact
Impact directive | Relevant impact |
---|
Wider plan type
Wider plan type | Wider plan focus | Name | Comments |
---|
Requirement directive
Requirement directive | Specification |
---|
Socio-economic
Costs total information
100000-500000 (Total cost category)
Ecosystem impact climate regulation
Not relevant for the specific application
Biophysical impacts
Water quality overall improvements
N/A info
Soil quality overall soil improvements
Not relevant for this application